1/5
Garden Sofa Set with Cushion 9 pcs Beige Poly Rattan vidaXL
Product out of stock
Product information
Description
This modern garden sofa set offers versatility and elegance to your outdoor living space. Combining leisure with refined aesthetics, its minimalist design features clean lines and functionality that appeal to contemporary tastes. Imagine serene afternoons, basking in the sun on this beautifully crafted furniture that enhances your garden, patio, or balcony. Balance outdoor enjoyment with a seamless blend of practical utility and sophisticated style.
- Premium Materials Experience the blend of poly rattan and solid acacia wood in this sofa set. Poly rattan offers a stylish and weather-resistant finish, while the solid acacia wood adds robust support and natural beauty to the overall design.
- Complete Set Components Including four center seats, four arm sofas, and a garden table, this ensemble transforms any outdoor area into a comfortable gathering hub. Each part complements the next, ensuring ease of use and comfort all around.
- Designed for Outdoor Comfort Featuring a weather-resistant structure with UV-resistance, this modular set promises long-lasting use. Its lightweight build allows easy rearrangement, adapting swiftly to different occasions or gatherings.
- Versatile Recommended Uses This set is perfect for social spaces where guests can enjoy drinks and conversation during spring and summer. From casual meet-ups to formal parties, these pieces provide the versatility required for diverse settings.
- Simple Care &Maintenance Keep this set pristine by covering it when not in use. Cleaning involves wiping occasionally with a damp cloth, ensuring effortless upkeep and durability.
- Colour: Beige
- Material: Poly rattan
- Durable
- Modular
- Light Weight
- UV-resistant materials
- Weather-resistant
- Seating
- Max weight: 955 kg
- Durable
- Modular
- Light Weight
- UV-resistant materials
- Weather-resistant
- Seat Pad
- Zip Fastening
- Assembly required: Yes
- Delivery-contains:
- 4 x Centre seat: 55 x 62 x 85 cm (LxWxH)
- 4 x Armsofa: 50.5 x 62 x 85 cm (LxWxH)
- 1 x Garden table: 55 x 55 x 37 cm (LxWxH)
- EAN: 8721158975423
- SKU: 3347428
- Brand: vidaXL
- SKU: 3347428









EU responsible party
Haba Trading B.V.
Mary Kingsleystraat 1 5928SK Venlo The Netherlands
Compliance-safety@vidaxl.com
Features
- BrandVIDAXL
- With armrestsYes
- With cushionYes
- ColourBeige
- Warranty2 year(s)
Advice from
Garden dining set buying guide
If you love to dine al fresco over the summer months, a good garden dining set is a must-have. Perfect for relaxation and general well-being, these outdoor sets come in a range of materials from teak and pine to resin or aluminium. Whatever your budget, read on to find the best dining set for your garden!
You are here: