Skip to main content

Product information

Description

General description

Get a better restful night's sleep with this bed frame! It makes a welcoming addition to any bedroom. The stable and long-lasting frame is made from solid pinewood, known for its strength and durability, while its straight grains and distinctive knots contribute to its rustic charm. The bed base is equipped with a slatted base for optimal support and breathability for your mattress. For convenience, the wooden bed has extra space underneath to keep your storage boxes out of sight. This bedstead is supported by sturdy feet, ensuring stability, safety, and firmness.

Technical specifications

  • Material: Solid pine wood (untreated)
  • Slat material: Plywood
  • Dimensions: 203.5 x 123.5 x 36 cm (L x W x H)
  • Suitable mattress size: 120 x 200 cm (W x L) (mattress not included)
  • Assembly required: Yes
  • SKU: 855358

Other information

  • A mattress is not included with this bed. Various selections of mattresses are available in our shop.

Features

  • Brand
    VIDAXL
  • Colour
    Brown
  • Mattress size
    120 x 200 cm
  • Recommended age
    Adult
  • With integrated storage
    Yes
  • With headboard
    No
  • Height
    36 cm
  • Assembly instructions
    Self-assembly required
  • Width
    123.5 cm
  • Bed with storage
    Yes
  • Length
    203.5 cm
  • Mattress length
    200 cm
  • Material
    Pine
  • Weight
    22.6 kg
  • Bed base included
    Yes
  • Bed type
    Simple
  • Bed base type
    Slatted
  • Bed frame type
    Single bed frame
  • Sold with mattress
    No
  • ManoMano Reference
    ME89839304
  • MMID
    785271719692
  • Product code
    8721158369857
  • EAN
    8721158369857

Customer reviews

Tthomas
Published on 24/01/2025, France

Please note, the mattress also purchased on manomano does not fit completely in the frame,

JJohanna
Published on 24/04/2025, France

The product met our expectations and was very sturdy. The only problem was that the delivery driver didn't bring the package (almost 50 kg) up to the building.

Bed base, mattress and headboard buying guide
Advice

Bed base, mattress and headboard buying guide

Read our guide
You are here:
The DIY, home and garden specialist

The DIY, home and garden specialist

Reliable delivery

Reliable delivery

Flexible payment options

Flexible payment options

More than 7 million individual and professional customers

More than 7 million individual and professional customers