TV Wall Cabinet Set 5 pcs Artisan Oak Engineered Wood vidaXL
Recommended Price
You may also like
Compare with similar items
Product information
Description
This TV Wall Unit combines practicality and aesthetic appeal to enhance any modern living room with its refined style. Crafted from engineered wood, this wall-mounted storage solution is designed with a sleek rectangular shape and offers ample shelving and cabinet space to neatly organize and display your entertainment essentials. Its modern design is characterized by clean lines, a minimalistic vibe, and adaptable storage options ideal for maximizing wall space in compact rooms.
- Engineered Wood Composition: Our TV wall unit is crafted from engineered wood, offering a contemporary look with durability, ease of maintenance, and strength. This material is chosen for its consistent finish and resistance to warping, ensuring a stable, long-lasting structure. The smooth finish complements modern interiors, and its lightweight nature allows for uncomplicated installation.
- Versatile LED Strip Lights: Incorporating LED strip lights, the unit offers versatile lighting options that enhance ambiance and highlight decor. These lights run on a USB power source for energy efficiency and easy connection. Customize brightness levels to suit your mood or create a striking focal point within your living room, making the unit functional and inviting.
- Board Shelves Functionality: The cabinet features board shelves suited for various storage needs. This allows users to organize electronics, decor items, or books effectively. Adjustable shelf placement adds further customization, creating a tailored storage solution for each user’s preferences. Maintenance of the shelves is straightforward for lasting use.
- Wall-Mounted Installability: This unit is designed for wall-mounting, saving floor space while blending seamlessly into your decor. The wall-mounted feature not only provides a clean, organized appearance but also ensures stability and safety for everyday use. Two individuals armed with a screwdriver can easily assemble and secure the unit.
- Practicality &Maintenance: The wooden TV wall unit requires minimal maintenance, staying clean with regular dusting. Its engineered wood is resistant to common stains, and storing components within the unit keeps living spaces clutter-free. This practical upkeep enhances the longevity and appearance, offering continued satisfaction.
- Colour: Artisan oak
- Material: Engineered wood
- Frame material: Engineered wood
- Shelf size: 80 x 10 x 18 cm
- Weight: 22.88 kg
- Number of shelves: 2
- With LED
- Mounting type: Wall-mounted
- Style: Modern
- Storage
- Indoor use only
- Assembly required: Yes
- Delivery contains:
- 1 x Wall cabinet: 100 x 30 x 30 cm(L x W x H), 2 x Wall cabinet: 40 x 30 x 30 cm(L x W x H), 2 x Wall shelf: 80 x 10 x 18(L x W x H)
- EAN: 8721359308150
- SKU: 3402953
- Brand: vidaXL
- SKU: 3402953









Please note to use only certified DC 5V input. Higher voltage may cause overheating to occur and may result in damage to the device and the potential risk of overheating and fire. Do not connect this product to any power supply other than one described in the manual, on the name plate, or specifically recommended by vidaXL. This appliance should not be used by children of 14 years or younger, and persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge concerning use of electronic appliances. Electricity is dangerous. Damage and improper installation, use or alteration (replacement of individual components) can lead to damage to the unit , resulting in electric shock and danger to the user. Do not operate this product in explosive atmospheres, such as in the presence of flammable liquids, gases and dust, or above 50 degrees Celsius or more. Do not switch on the product if the connecting cable or power supply are visible damaged. If the external flexible cable or cord of this luminaire is damaged, it shall be exclusively replaced by the manufacturer or his service agent or a similar qualified person in order to avoid a hazard. Turn off power while installing and maintaining. Make sure the bulbs have cooled down. The light source of this luminaire is not replaceable; when the light source reaches its end of life the whole luminaire shall be replaced. For indoor use only, do not use this product outdoors. The product has a USB connector, but the certified 5V USB power source is not included.
EU responsible party
Haba Trading B.V.
Mary Kingsleystraat 1 5928SK Venlo The Netherlands
Compliance-safety@vidaxl.com
Features
- BrandVIDAXL
- Width40 cm
- Height30 cm
- Depth30 cm
- ColourBrown
- With integrated lightingYes
- Warranty1 year(s)
- MaterialEngineered wood
- Weight27.38 kg
- On castorsNo
- ManoMano ReferenceME98444028
- MMID291779063461
- Product code8721359308150
- EAN8721359308150



















