Skip to main content
1/4

Ultrasonic Dog Whistle with 2 Long Leads, Long Range, Dog Training Whistle (Black/White)

£46.75
Of which environmental contribution £0.01 including VAT.
Sold by Sinocor GmbH

Product information

Description

  • Package List: Dog whistle that can emit different frequencies to meet various command needs, such as recall, stop, etc. The recall dog whistle provides comprehensive training support for your dog, allowing you to more easily manage different scenarios.
  • Silent Ultrasonic Technology: Our high-frequency silent recall dog whistle uses ultrasonic technology. The emitted whistle signal can only be heard by the dog; the human ear cannot detect it. The dog whistle avoids noise interference for people and can issue and execute commands to the dog with greater accuracy.
  • Increase Dog Reactivity: With the Rütter recall dog whistle, the dog's reactivity can be effectively improved. Long-term training can give the dog a conditioned response; when it hears the dog whistle signal, it will obey your command, whether during play or work, thus improving efficiency. Easy to carry: This ultrasonic dog whistle set has a lanyard that allows you to hang it around your neck or attach it to a bag to prevent it from easily getting lost. The small and portable design of the dog whistle allows you to take it anywhere to train your dog anytime.

Features

  • Brand
    TEHTUY
  • Colour
    Black
  • Animal
    Dog
  • Height
    1 cm
  • Width
    1 cm
  • Length
    1 cm
  • Material
    Leather
  • Type of training accessories
    Whistle
  • ManoMano Reference
    ME98600457
  • MMID
    541598297529
  • Product code
    mano-HWLX-02168
  • EAN
    6282768299023
Advice from

Dog chew buying guide

What dog doesn't like to get stuck into a good chew? None! That's why dog chews come in all shapes and sizes. From rawhide to horns, real bones to rubber chews, there's a chew out there for every puppy or dog so read on to find the best dog chew for your pet.
Dog chew buying guide
You are here:
The DIY, home and garden specialist

The DIY, home and garden specialist

Reliable delivery

Reliable delivery

Flexible payment options

Flexible payment options

More than 7 million individual and professional customers

More than 7 million individual and professional customers