1/4
Ultrasonic Dog Whistle with 2 Long Leads, Long Range, Dog Training Whistle (Black/White)
Sold by Selphora
Product information
Description
Packing List: Dog whistle that can emit different frequencies to meet various command needs, such as recall, stop, etc. The recall dog whistle provides comprehensive training support for your dog, allowing you to more easily manage different scenarios. Silent Ultrasonic Technology: Our high-frequency silent recall dog whistle uses ultrasonic technology. The emitted whistle signal can only be heard by the dog; the human ear cannot detect it. The dog whistle avoids noise interference for people and can issue and execute commands to the dog with greater accuracy. Increase Dog Reactivity: With the Rütter recall dog whistle, the dog's reactivity can be effectively improved. Long-term training can give the dog a conditioned response; when it hears the whistle signal, it will obey your command, whether playing or working, thus improving efficiency. Easy to carry: This ultrasonic dog whistle set features a lanyard that allows you to hang it around your neck or attach it to a bag to prevent it from getting lost. The small and portable design of the dog whistle allows you to take it anywhere for dog training anytime.
Features
- BrandOTHERS
- ColourBlack
- MaterialMetal
- Type of training accessoriesWhistle
- ManoMano ReferenceME101913411
- MMID317889948675
- Product code4027421313249
- EAN4027421313249
Advice from
Dog chew buying guide
What dog doesn't like to get stuck into a good chew? None! That's why dog chews come in all shapes and sizes. From rawhide to horns, real bones to rubber chews, there's a chew out there for every puppy or dog so read on to find the best dog chew for your pet.
You are here: