Skip to main content

You may also like

Fabric Wardrobe with Compartments and Rods 45x150x176 cm Black vidaXLVIDAXL
2 options

Fabric Wardrobe with Compartments and Rods 45x150x176 cm Black vidaXL

121
-10%
£48.99Lowest price 30d
Free shipping
245960  Wardrobe Metal Industrial Style 67x35x107 cm Black vidaXLVIDAXL
3 options

245960 Wardrobe Metal Industrial Style 67x35x107 cm Black vidaXL

80
-15%
£139.99Lowest price 30d
Free shipping
Saddle Cabinet Anthracite 53x53x105 cm Steel vidaXLVIDAXL
2 options

Saddle Cabinet Anthracite 53x53x105 cm Steel vidaXL

28
-10%
£125.99Lowest price 30d
Free shipping
HOMCOM Fabric Wardrobe w/ Shelves Hanging Rail Foldable Closets Light GreyHOMCOM
4 options

HOMCOM Fabric Wardrobe w/ Shelves Hanging Rail Foldable Closets Light Grey

-4%
£20.99Lowest price 30d
Free shipping
Wall Mounted Cabinet Old Wood 69.5x34x90 cm vidaXLVIDAXL
8 options

Wall Mounted Cabinet Old Wood 69.5x34x90 cm vidaXL

3
Free shipping

Compare with similar items

Often purchased together

Product information

Description

This wall-mounted cabinet effortlessly combines style and functionality, making it a standout choice for those looking to maximize space. Perfectly designed for living rooms, it offers ample storage within a sleek, rectangular form. Engineered wood ensures a reliable build, promising years of use.

  • Robust Engineered Wood: This cabinet is crafted from durable engineered wood, ensuring a sturdy and long-lasting structure. It's designed to support daily use in diverse settings, maintaining its appearance and functionality over time.
  • Space-Saving Design: Our wall-mounted cabinet is ideal for environments with limited space, providing essential storage without the bulk of traditional floor-standing units. The elegant rectangular shape takes full advantage of vertical space.
  • Vintage Style: With a nod to a previous era, the cabinet's vintage style adds a classic touch to your living room. It combines a nostalgic charm with modern functionality, making it a versatile piece for various interior themes.
  • Functional Board Shelves: Featuring board shelves made of engineered wood, this cabinet offers straightforward shelving solutions for efficiently organizing items. The practical design accommodates a variety of objects, from books to decorative pieces.
  • Simple Maintenance: Maintenance is as simple as wiping with a damp cloth, ensuring that this piece remains a clean and attractive part of your home decor. This ease of care makes it a practical option for busy lifestyles.
  • Colour: Artisan oak
  • Material: Engineered wood
  • Handle material: Metal
  • Overall dimensions: 59 x 31 x 60 cm (L x W x H)
  • Number of shelves: 1
  • Number of doors: 2
  • Max. weight capacity: 60 kg in total, 20 kg per shelf
  • Weight: 14.46 kg
  • Mounting type: Wall-mounted
  • Ample storage
  • Versatile use
  • Assembly required: Yes
  • Delivery contains:
  • 1 x Wall-Mounted Cabinet
  • EAN: 8721364429468
  • SKU: 897904
  • Brand: vidaXL
  • SKU: 897904

 

EU responsible party

Haba Trading B.V. 

Mary Kingsleystraat 1 5928SK Venlo The Netherlands

Compliance-safety@vidaxl.com

Features

  • Brand
    VIDAXL
  • Width
    59 cm
  • Height
    60 cm
  • Depth
    31 cm
  • Colour
    Brown
  • Maximum load
    60 kg
  • Warranty
    2 year(s)
  • Assembly instructions
    Self-assembly required
  • Material
    Engineered wood
  • Number of doors
    2
  • Internal organisation
    Shelves + drawers
  • Wardrobe included
    Yes
  • Weight
    14.5 kg
  • Pcs per pack
    1
  • Style
    Vintage
  • ManoMano Reference
    ME215969963
  • MMID
    163534421059
  • Product code
    8721364429468
  • EAN
    8721364429468
Wardrobe buying guide
Advice

Wardrobe buying guide

Read our guide
You are here:
The DIY, home and garden specialist

The DIY, home and garden specialist

Reliable delivery

Reliable delivery

Flexible payment options

Flexible payment options

More than 7 million individual and professional customers

More than 7 million individual and professional customers