Skip to main content
1/5

Garden Sofa Set 8 pcs Grey Poly Rattan vidaXL

Sold by vidaXL

You may also like

3 Piece Bistro Set Ceramic Tile Blue and White vidaXLVIDAXL
12 options

3 Piece Bistro Set Ceramic Tile Blue and White vidaXL

112
Free shipping
9 Piece Garden Dining Set with Cushions Poly Rattan Beige vidaXLVIDAXL
37 options
Sale

9 Piece Garden Dining Set with Cushions Poly Rattan Beige vidaXL

640
-14%
£542.99
Free shipping
9 Piece Garden Dining Set with Cushions Poly Rattan Beige vidaXLVIDAXL
37 options
Sale

9 Piece Garden Dining Set with Cushions Poly Rattan Beige vidaXL

640
-14%
£488.99
Free shipping
Mosaic Bistro Set Terracotta Iron and Ceramic vidaXLVIDAXL
12 options
Sale

Mosaic Bistro Set Terracotta Iron and Ceramic vidaXL

112
-6%
£211.99
Free shipping
Folding metal bistro garden table with 2 chairs, Emilia, Beige, 60x60x71 cmSWEEEK
6 options
Sale

Folding metal bistro garden table with 2 chairs, Emilia, Beige, 60x60x71 cm

357
-8%
£88.99
Free shipping

Compare with similar items

Product information

Description

The Modular Garden Sofa Set brings your outdoor experience to the next level with its modern design characteristics and functional appeal. Featuring a finish that captures elegant simplicity with clean lines, this set is designed for ultimate versatility, allowing it to complement and enhance any garden or patio environment. Its modular capabilities let users customize their seating arrangement to suit their garden party setup or a tranquil solo relaxation corner. Crafted with materials suitable for the seasonally diverse outdoor setting, this set creates an inviting ambiance perfect for Spring and Summer.

  • Materials The Poly Rattan seamlessly crafted into each component offers a sophisticated weave that is not only weather-resistant but also resists UV damage. Known for durability, this richly textured surface adds a touch of elegance while accompanied by Solid Acacia wood details highlighted in the table's surface. This combination guarantees both beauty and long-term usage outdoors.
  • Included Components The set features a finished back that presents a clean, versatile style for any perspective. The modular capability allows the set to be arranged in multiple configurations according to your outdoor needs. Complete with a soft polyester fiberfill cushion seat, it increases comfort without compromising on style.
  • Features /Function /Design This sofa set employs a lightweight design perfect for rearranging based on desired configuration for any social gathering. Its durability offers long-lasting enjoyment, protected with UV-resistant materials that fend off sun radiance, ensuring the look remains fresh and new.
  • Recommended Uses Suited for the patio, garden, or deck, this set grants adaptability to various settings while maintaining visual appeal. Whether hosting a summer garden party or seeking a personal retreat, its versatility in arrangement supports any occasion.
  • Care &Maintenance To extend the life of your Modular Garden Sofa Set, use outdoor furniture covers when not in use. Routine cleaning with a soft cloth will preserve its appearance, ensuring longevity and continuous charm.
  • Colour: Grey
  • Material: Poly rattan
  • Frame material: Powder-coated steel
  • Max. weight capacity: 845 kg
  • Durable
  • Modular
  • Light weight
  • UV-resistant materials
  • Weather-resistant
  • Pillow included: No
  • Assembly required: Yes
  • Delivery contains:
  • 3 x Centre seat: 55 x 62 x 85 cm (LxWxH)
  • 1 x Corner seat: 62 x 62 x 85 cm (LxWxH)
  • 2 x Armsofa: 61.5 x 62 x 85 cm (LxWxH),1 x Footstool: 55 x 55 x 37 cm (LxWxH)
  • 1 x Garden table: 55 x 55 x 37 cm (LxWxH)
  • EAN: 8721158979742
  • SKU: 3347860
  • Brand: vidaXL
  • SKU: 3347860

 

EU responsible party

Haba Trading B.V. 

Mary Kingsleystraat 1 5928SK Venlo The Netherlands

Compliance-safety@vidaxl.com

Features

  • Brand
    VIDAXL
  • Colour
    Grey
  • With armrests
    Yes
  • Intended use
    Outdoor
  • Adjustable backrest
    Yes
  • Warranty
    2 year(s)
  • Assembly instructions
    Self-assembly required
  • Width
    55 cm
  • Structure material
    Rattan
  • Material
    Polyrattan
  • Weight
    60.4 kg
  • On castors
    No
  • Wood type
    Acacia
  • Sofa type
    Modular sofa
  • ManoMano Reference
    ME92637935
  • MMID
    408496199076
  • Product code
    8721158979742
  • EAN
    8721158979742
Advice from

Garden dining set buying guide

If you love to dine al fresco over the summer months, a good garden dining set is a must-have. Perfect for relaxation and general well-being, these outdoor sets come in a range of materials from teak and pine to resin or aluminium. Whatever your budget, read on to find the best dining set for your garden!
Garden dining set buying guide
You are here:
The DIY, home and garden specialist

The DIY, home and garden specialist

Reliable delivery

Reliable delivery

Flexible payment options

Flexible payment options

More than 7 million individual and professional customers

More than 7 million individual and professional customers