Skip to main content

You may also like

90335  Party Tent 3x4 m Blue vidaXLVIDAXL
20 options

90335 Party Tent 3x4 m Blue vidaXL

424
Free shipping
90336  Party Tent 3x6 m White vidaXLVIDAXL
20 options

90336 Party Tent 3x6 m White vidaXL

424
Free shipping
90337  Party Tent 3x6 m Blue vidaXLVIDAXL
20 options

90337 Party Tent 3x6 m Blue vidaXL

424
Free shipping
90338  Party Tent 3x9 m White vidaXLVIDAXL
20 options

90338 Party Tent 3x9 m White vidaXL

424
-9%
£197.99Lowest price 30d
Free shipping
90339  Party Tent 3x9 m Blue vidaXLVIDAXL
20 options

90339 Party Tent 3x9 m Blue vidaXL

424
-4%
£170.99Lowest price 30d
Free shipping
91429  Garden Marquee 3x12 m White vidaXLVIDAXL
20 options

91429 Garden Marquee 3x12 m White vidaXL

424
-9%
£255.99Lowest price 30d
Free shipping
91430  Garden Marquee 3x12 m Blue vidaXLVIDAXL
20 options

91430 Garden Marquee 3x12 m Blue vidaXL

424
Free shipping
45101  Party Tent 3x4 m Green vidaXLVIDAXL
20 options

45101 Party Tent 3x4 m Green vidaXL

424
Free shipping
45099  Party Tent 3x3 m Green vidaXLVIDAXL
20 options

45099 Party Tent 3x3 m Green vidaXL

424
Free shipping
45100  Party Tent 3x4 m Anthracite vidaXLVIDAXL
20 options

45100 Party Tent 3x4 m Anthracite vidaXL

424
Free shipping
45102  Party Tent 3x6 m Anthracite vidaXLVIDAXL
20 options

45102 Party Tent 3x6 m Anthracite vidaXL

424
Free shipping
45103  Party Tent 3x6 m Green vidaXLVIDAXL
20 options

45103 Party Tent 3x6 m Green vidaXL

424
Free shipping
45097  Party Tent 3x3 m Blue vidaXLVIDAXL
20 options

45097 Party Tent 3x3 m Blue vidaXL

424
Free shipping
Party Tent 400 x 300 x 255 cm Red PE and Steel vidaXLVIDAXL
20 options

Party Tent 400 x 300 x 255 cm Red PE and Steel vidaXL

424
Free shipping
Party Tent 600 x 300 x 255 cm Red PE and Steel vidaXLVIDAXL
20 options

Party Tent 600 x 300 x 255 cm Red PE and Steel vidaXL

424
Free shipping
Party Tent 300 x 300 x 255 cm Red PE and Steel vidaXLVIDAXL
20 options

Party Tent 300 x 300 x 255 cm Red PE and Steel vidaXL

424
Free shipping
Party Tent 900 x 300 x 255 cm Red PE and Steel vidaXLVIDAXL
20 options

Party Tent 900 x 300 x 255 cm Red PE and Steel vidaXL

424
Free shipping
Party Tent 1200 x 300 x 255 cm Red PE and Steel vidaXLVIDAXL
20 options

Party Tent 1200 x 300 x 255 cm Red PE and Steel vidaXL

424
Free shipping

Compare with similar items

Product information

Description

This foldable party tent is excellent for a wide range of outdoor use.

  • Foldable design: The marquee is foldable for easy storage and transport.
  • Premium roof material: This pavilion is made of 210D oxford fabric with silver coating, offering sun-shading and water-repellent performance for outdoor coverage.
  • Practical sidewalls: This canopy gazebo has side walls to help keep insects out. The side panels feature decorative windows and the door panel with a zip is convenient for easy entrance.
  • Sturdy frame: The steel frame of this gazebo ensures sturdiness and stability.

Note:

  • This product should NEVER be used under bad weather, such as strong wind, heavy rain, snow, storm, etc.
  • Each product comes with an assembly manual in the box for easy assembly.
  • This product is not suitable for use as a carport.
  • Colour: Red
  • Roof material: 210D oxford fabric with silver coating
  • Sidewall material: 210D oxford fabric, PE (Polyethylene)
  • Frame material: Steel
  • Overall dimensions: 291 x 291 x 245 cm (L x W x H)
  • EAN: 8720286974612
  • SKU: 93527
  • Brand: vidaXL
  • SKU: 93527
The product is not suitable for the weather such as the strong wind, snow fall and the extreme weather.

 

EU responsible party

Haba Trading B.V. 

Mary Kingsleystraat 1 5928SK Venlo The Netherlands

Compliance-safety@vidaxl.com

Features

  • Brand
    VIDAXL
  • Colour
    Red
  • Warranty
    2 year(s)
  • Material
    Polyethylene
  • Origin
    Made in China
  • Shape
    Square
  • Height
    2.45 m
  • Assembly instructions
    Self-assembly required
  • Width
    2.91 m
  • Length
    2.91 m
  • Structure material
    Steel
  • Requires assembly
    Yes
  • Weight
    11.95 kg
  • Pcs per pack
    1
  • ManoMano Reference
    ME60232933
  • MMID
    455873191678
  • Product code
    8720286974612
  • EAN
    8720286974612

Customer reviews

KKarine
Published on 11/09/2023, France

Value for money nothing to say Quality of the covering a little fair fragile frame to be careful assembly very easy disassembly

LLENAIC
Published on 30/08/2025, France

The bars are too low, I hit my head on them even though I'm 1.70m tall.

Pphilippe
Published on 12/06/2023, France

A bit light on the tarpaulins

MManoMano Customer
Published on 23/03/2026, Italy

Nice and easy to set up, the only doubt is about the cover which doesn't seem very resistant, we'll see with time!

MManoMano Customer
Published on 13/02/2023, Spain

Good product

MMiguel
Published on 02/12/2022, Spain

The price-quality tent is not bad. The bad thing is getting the invoice for this order. I have sent 5 emails and they do not solve anything, they do not send me the invoice with my CIF

Gazebo buying guide
Advice

Gazebo buying guide

Read our guide
You are here:
The DIY, home and garden specialist

The DIY, home and garden specialist

Reliable delivery

Reliable delivery

Flexible payment options

Flexible payment options

More than 7 million individual and professional customers

More than 7 million individual and professional customers