Easy to assemble, seems to be of good quality (time will tell as I just received it), nice design, sturdy with 8 legs (avoids the belly in the middle of the table), I recommend this product which was delivered quickly.
Garden Table Brown 350 x 100 x 73 cm Poly Rattan vidaXL
Lowest price
Product information
Description
This Modern Garden Table adds a touch of elegance to any outdoor space, creating a perfect setting for your gatherings. With its sleek lines and contemporary design, it seamlessly fits into gardens, terraces, and outdoor lounges, offering a stylish and functional solution for dining or social activities. Its rectangular shape provides ample room, making it an ideal fit for those hosting large parties or looking to enjoy family meals under the open sky. The table's robust appearance is matched by its sturdy construction, ensuring it stands the test of time and use.
- Steel Frame Strength: The sturdy steel frame forms the backbone of this table, offering resistance to elements while ensuring robust support. Its reliable construction prevents wobbling, ensuring a stable experience even on uneven outdoor surfaces. This structural integrity helps maintain the table's shape and function despite frequent use in varying weather conditions, making it a dependable asset for alfresco dining and social gatherings.
- Poly Rattan Surface: Poly rattan, celebrated for its weather-resistant properties, forms the table's surface, providing both visual and functional appeal. It mimics the look of natural rattan, adding a touch of elegance and warmth to outdoor areas. The material is easy to clean and maintain, ensuring minimum effort while providing maximum enjoyment of your outdoor spaces.
- Optimized Leg Design: The table's post legs offer essential support and stability, crucial for robust furniture used in dynamic settings. Their black color and simple design complement the table's modern aesthetic, enabling it to integrate seamlessly into a variety of outdoor décors. These legs ensure functionality without compromising on style, supporting its extended use during outdoor festivities.
- Functional Rectangular Shape: This banquet-style table is tailored for large gatherings, offering spaciousness without overwhelming flow. Its rectangular silhouette is ideal for efficiently accommodating many guests, while still allowing space for food display, decor, or interactive activities. This shape enhances the flexibility and utility of the table, allowing for imaginative arrangements and uses.
- Practical Care Tips: A quick cover-up when not in use safeguards the table against impacts, prolonging its lifespan and maintaining its appearance. Keeping it protected ensures it remains a fixture in your outdoor setup, offering continuous enjoyment over the years with minimal upkeep required.
- Colour: Brown
- Material: Poly rattan
- Overall dimensions: 350 x 100 x 74 cm (L x W x H)
- Durable
- Assembly required: Yes
- Delivery-contains:
- 1 x Garden table
- EAN: 8721288624772
- SKU: 3378525
- Brand: vidaXL
- SKU: 3378525





EU responsible party
Haba Trading B.V.
Mary Kingsleystraat 1 5928SK Venlo The Netherlands
Compliance-safety@vidaxl.com
Features
- BrandVIDAXL
- ColourBrown
- Number of seats1
- Contains woodNo
- ShapeRectangular
- Height74 cm
- Assembly instructionsSelf-assembly required
- Width100 cm
- Length350 cm
- MaterialPolyrattan
- Weight36.4 kg
- Pcs per pack1
- StyleModern
- Type of outdoor tableGarden
- ManoMano ReferenceME93605272
- MMID997547188491
- Product code8721288624772
- EAN8721288624772
Customer reviews
Stunning
Alright
Product never received. No news from the carrier. I've been left without any updates.
Garden table buying guide
Advice from our experts