1/5
Shoe Rack Grey Sonoma 60x30x45 cm Engineered Wood vidaXL
Choose your model
Product
Price
Quantity
Buying for your business?
Negotiated prices excl. VAT up to -20%
Sold by vidaXL
You may also like
Compare with similar items
Product information
Description
This classic shoe rack for the entryway is exceptionally beautiful and can make your room more organised.
- Durable material: The engineered wood is of exceptional quality with smooth surface and also features strength, stability and resistance to moisture.
- Stable frame: The black powder-coated steel base provides additional stability and sturdiness for this shoe storage.
- Ample storage space: This shoe cabinet has a sloping shelf, providing storage space for you to arrange shoes neatly.
- Sturdy top: You can place your bag and favourite decorative items on the top of this shoe organiser.
- Colour: Grey sonoma
- Material: Engineered wood, powder-coated steel
- Overall dimensions: 60 x 30 x 45 cm (W x D x H)
- Assembly required: Yes
- EAN: 8721012123885
- SKU: 833416
- Brand: vidaXL
- SKU: 833416








EU responsible party
Haba Trading B.V.
Mary Kingsleystraat 1 5928SK Venlo The Netherlands
Compliance-safety@vidaxl.com
Features
- BrandVIDAXL
- Width60 cm
- Depth30 cm
- ColourGrey
- Height45 cm
- Assembly instructionsSelf-assembly required
- MaterialEngineered wood
- Weight4.5 kg
- Pcs per pack1
- Type of furnitureShoe rack
- ManoMano ReferenceME84224195
- MMID351097081968
- Product code8721012123885
- EAN8721012123885
You are here:
Related categories
Tall shoe rack
Vertical shoe rack
Wall mounted shoe rack
White shoe rack
Narrow shoe rack
Large shoe cabinet
Small shoe rack
Wooden shoe storage
Bamboo shoe rack
Tall shoe cabinet
Shoe racks for wardrobes
Dunelm shoe rack
Argos shoe rack
Camping shoe storage
Narrow shoe cabinet
Shoe cabinet
Shoe Cabinet Smoked Oak 60x35x105 cm Engineered Wood vidaXL
Shoe Cabinet Smoked Oak 150x35x45 cm Engineered Wood vidaXL
Shoe Cabinet Smoked Oak 102x36x60 cm Engineered Wood vidaXL
Shoe Cabinet Smoked Oak 38x35x50 cm Engineered Wood vidaXL
Shoe Cabinet Smoked Oak 30x35x105 cm Engineered Wood vidaXL
Shoe Cabinet Smoked Oak 60x35x105 cm Engineered Wood vidaXL



















