1/5
Sliding Door with Hardware Set 102,5x205 cm ESG Glass&Aluminium vidaXL
Choose your model
Product
Price
Quantity
Buying for your business?
Negotiated prices excl. VAT up to -20%
Sold by vidaXL
You may also like
Compare with similar items
Product information
Description
Add a touch of modern style to your home with this sliding door instantly. It provides the perfect solution for a space-saving opening.
- Durable material: Thanks to the intelligent structure, tempered glass is stronger and more durable than any other glass. Tempered glass is known to withstand heavy impacts, scratches, blows, etc.
- Stable and long-lasting frame: Aluminum is both lightweight and durable, with excellent corrosion resistance due to its self-protective oxide layer. This aluminium door is designed for longevity, making it an ideal choice for anyone seeking a robust door.
- Quiet and smooth sliding: Thanks to the internal bearings, your internal sliding door will slide smoothly and quietly. Doorstops are also included to prevent the derailing of the rollers, while the rubber gaskets will buffer the bump from rollers and reduce the noise.
- Good privacy: The door panel is made of matt glass, which offers privacy protection for your home and office to a great extent.
- Slim design: The slim frame design gives the sliding glass door a modern and minimalist appearance.
- Sliding door:
- Colour: Black and matt
- Material: ESG glass, aluminium
- Door size: 102.5 x 205 cm (W x H)
- Glass thickness: 5 mm
- Door thickness: 2 cm
- With frosted effect
- Hardware kit:
- Colour: Black
- Material: Powder-coated steel
- Sliding rail total length: 213.5 cm
- Maximum load capacity: 100 kg
- Suitable door size: 107 cm in width, 35-45 mm in thickness
- With 2 holes on each 2 sides
- Assembly required: Yes
- Delivery contains:
- 1 x Sliding door
- 2 x Sliding rail
- 2 x Door stop
- 2 x Roller
- 5 x Fixing clamp
- 1 x Floor guide
- Other necessary hardware
- EAN: 8721158829184
- SKU: 3332904
- Brand: vidaXL
- SKU: 3332904







Do not use this item if any components are broken, torn or missing.
EU responsible party
Haba Trading B.V.
Mary Kingsleystraat 1 5928SK Venlo The Netherlands
Compliance-safety@vidaxl.com
Features
- BrandVIDAXL
- ColourBlack
- MaterialAluminium
- Colour nameNero
- glazedYes
- Intended useIndoor
- Door thickness20 mm
- Door functionSliding door
- Door height205 cm
- Number of door leafSingle leaf
- Weight42.44 kg
- Pcs per pack1
- Door opening sideReversible
- Type of interior doorSliding door
- ManoMano ReferenceME90453456
- MMID331186396184
- Product code8721158829184
- EAN8721158829184
Sliding door buying guide
Advice from our experts
You are here:



















