It's quite easy to assemble. The dimensions were exactly what we needed. You have to be quite precise when attaching it to the wall; there's very little room for error.
Kitchen Wall Cabinet "Porto" Smoked Oak Engineered Wood vidaXL
Lowest price
You may also like
Compare with similar items
Product information
Description
This kitchen wall cabinet optimises your kitchen space, providing ample storage space for your personal belongings!
- Stable and durable material: Engineered wood is a durable and stable material with a smooth surface that is resistant to moisture, warping, and splitting, making it a reliable choice for a variety of projects.
- Ample storage space: The kitchen wall cabinet offers sufficient space to store bowls, plates, pots, and other kitchen appliances.
- Practical door: The door helps maintain a clean and organised space by concealing kitchen appliances and clutter behind them.
- Easy to maintain: Thanks to its smooth surface, this mounted wall cabinet is easy to clean with a damp cloth and requires less maintenance.
- Wide applications: This wall mounted kitchen cabinet is versatile and suitable for your needs in bedrooms, living rooms, hallways, and so on.
Warning:
- To prevent it from tipping over, this product must be used with the provided wall attachment device.
Good to know:
- Screw(s) and plug(s) for inside the wall are not included. Seek and use screw(s) and plug(s) suitable for your walls. If you are uncertain, seek professional advice. Read and follow each step of the instruction carefully.
- Colour: Smoked oak
- Material: Engineered wood
- Overall dimensions: 30 x 31 x 60 cm (W x D x H)
- Dimensions of each compartment: 27 x 29.5 x 27.5 cm (W x D x H)
- Maximum weight capacity: 60 kg
- Weight capacity of per layer: 25 kg
- Range name: Porto
- Assembly required: Yes
- EAN: 8721158423689
- SKU: 854022
- Brand: vidaXL
- SKU: 854022









EU responsible party
Haba Trading B.V.
Mary Kingsleystraat 1 5928SK Venlo The Netherlands
Compliance-safety@vidaxl.com
Features
- BrandVIDAXL
- Height60 cm
- Width30 cm
- With fixings suppliedNo
- Load capacity per level25 kg
- Maximum load60 kg
- ColourBrown
- Furniture FunctionStorage unit
- Assembly instructionsSelf-assembly required
- MaterialEngineered wood
- Weight10.3 kg
- Depth31 cm
- StyleModern
- Type of installation methodTo hang
- OpeningHinged
- ManoMano ReferenceME90452854
- MMID289959065975
- Product code8721158423689
- EAN8721158423689
Customer reviews
Correct, horizontal marks appear after removing the film, which is a shame, otherwise the dimensions are good for this dishwasher.
Once the handles are replaced with more modern ones and a plate is added on top, it looks more luxurious.
Good product despite some aesthetic issues, but the seller was very responsive!
For the price, it's very reasonable.
The legs come too short and have to buy new legs and the handles are not handles and have to buy handles on top.
Fitted kitchen buying guide
Advice from our experts



















