Skip to main content

You may also like

811880  Headboard Cabinet White 180x19x103,5 cm vidaXLVIDAXL
43 options

811880 Headboard Cabinet White 180x19x103,5 cm vidaXL

252
-16%
£79.99Lowest price 30d
Free shipping
811925  Headboard Cabinet White 140x18,5x104,5 cm vidaXLVIDAXL
44 options

811925 Headboard Cabinet White 140x18,5x104,5 cm vidaXL

277
-4%
£90.99Lowest price 30d
Free shipping
811916  Headboard Cabinet White 120x18,5x102,5 cm vidaXLVIDAXL
44 options

811916 Headboard Cabinet White 120x18,5x102,5 cm vidaXL

277
Free shipping
Headboard Cabinet Black 120x18,5x102,5 cm vidaXLVIDAXL
44 options

Headboard Cabinet Black 120x18,5x102,5 cm vidaXL

277
Free shipping
Headboard Cabinet Grey Sonoma 160x18,5x104,5 cm vidaXLVIDAXL
44 options

Headboard Cabinet Grey Sonoma 160x18,5x104,5 cm vidaXL

277
Free shipping
Headboard Cabinet Grey Sonoma 220x19x101.5 cm vidaXLVIDAXL
43 options

Headboard Cabinet Grey Sonoma 220x19x101.5 cm vidaXL

252
Free shipping
Headboard Cabinet Artisan Oak 160x18,5x103,5 cm Engineered Wood vidaXLVIDAXL
44 options

Headboard Cabinet Artisan Oak 160x18,5x103,5 cm Engineered Wood vidaXL

277
-7%
£103.99Lowest price 30d
Free shipping
Headboard Cabinet Black Oak Engineered Wood vidaXLVIDAXL
44 options

Headboard Cabinet Black Oak Engineered Wood vidaXL

277
Free shipping
Headboard Cabinet Black Oak Engineered Wood vidaXLVIDAXL
43 options

Headboard Cabinet Black Oak Engineered Wood vidaXL

252
Free shipping
Headboard Cabinet Black Oak Engineered Wood vidaXLVIDAXL
44 options

Headboard Cabinet Black Oak Engineered Wood vidaXL

277
Free shipping
Headboard Cabinet Black Oak Engineered Wood vidaXLVIDAXL
44 options

Headboard Cabinet Black Oak Engineered Wood vidaXL

277
-15%
£50.99Lowest price 30d
Free shipping
Headboard Cabinet Black Oak Engineered Wood vidaXLVIDAXL
44 options

Headboard Cabinet Black Oak Engineered Wood vidaXL

277
Free shipping
Headboard Cabinet Black Oak Engineered Wood vidaXLVIDAXL
44 options

Headboard Cabinet Black Oak Engineered Wood vidaXL

277
Free shipping

Compare with similar items

Product information

Description

With fashionable design, this wooden bed headboard gives your bed frame a complete look and will suit any bedroom.

  • Fancy outlook: The stylish colour and design of the headboard could easily blend into your interior.
  • Premium material: Solid pine wood is a beautiful natural material. Treat the surface with oil, wax, lacquer, or a glazing finish for a stronger surface and easy cleaning. Pine wood has a straight grain, and the knots give the material its signature, rustic look.
  • Applicable bed types: The headboard is used for beds without headboard.

Good to know:

  • This headboard is designed exclusively for use with our specific bed frames and is not compatible with any other bed frames.
  • Material: Solid pinewood (untreated)
  • Dimensions: 126 x 4 x 100 cm (W x D x H)
  • Assembly required: Yes
  • EAN: 8720286909690
  • SKU: 814184
  • Brand: vidaXL
  • SKU: 814184

 

EU responsible party

Haba Trading B.V. 

Mary Kingsleystraat 1 5928SK Venlo The Netherlands

Compliance-safety@vidaxl.com

Features

  • Brand
    JINLEFU
  • Colour
    Brown
  • Height
    100 cm
  • Width
    126 cm
  • Origin
    Made in China
  • Shape
    Rectangular
  • Assembly instructions
    Self-assembly required
  • Material
    Pine
  • Depth
    4 cm
  • ManoMano Reference
    ME85111376
  • MMID
    467570575406
  • Product code
    JRVDZX-814184_DE
  • EAN
    9423340343780

Customer reviews

MManoMano Customer
Published on 20/08/2024

original product not always easy to assemble despite good guides. A few small splinters without major consequences on edges. Blueish reflections on small areas or to hide product defects?

1 person found this helpful
Headboard buying guide
Advice

Headboard buying guide

Read our guide
You are here:
The DIY, home and garden specialist

The DIY, home and garden specialist

Reliable delivery

Reliable delivery

Flexible payment options

Flexible payment options

More than 7 million individual and professional customers

More than 7 million individual and professional customers