Skip to main content
1/5

Sunshade Sail Rectangular 3 x 4.5 m HDPE Yellow and White vidaXL

Buying for your business?

Negotiated prices excl. VAT up to -20%

Sold by vidaXL

Compare with similar items

Product information

Description

The Modern Sunshade Sail is an ideal outdoor accessory for creating a stylish and functional shade solution. Designed for use in gardens, terraces, and balconies, this accessory shields you from direct sunlight while maintaining airflow and comfort.

  • Superior HDPE Fabric: Constructed from 100% HDPE (high-density polyethylene), this sunshade is robust and offers essential durability against the elements. The breathable material allows for airflow, preventing heat buildup while also being mold and UV resistant.
  • Durable Steel Fasteners: With stainless steel fasteners at each corner, the sunshade is convenient to install and offers reliable reinforcement. The fastener design ensures secure attachment, enhancing the sail's stability against the wind.
  • Effective UV Protection: Enjoy approximately 90% UV protection with this sunshade. The effective UV barrier reduces direct sunlight impact, allowing you to spend extended time outdoors comfortably.
  • Wide Application Possibility: Suitable for gardens, balconies, or playgrounds, the sunshade offers versatile placement. The adaptable design means it can be used across various settings, giving your outdoor spaces a touch of practicality and style.
  • Effortless Assembly: The installation is straightforward thanks to stainless steel fasteners and included ropes. Designed for a two-person assembly, setting up the sunshade is seamless for immediate use across outdoor areas.
  • Colour: Yellow and white
  • Material: HDPE
  • Overall dimensions: 3 x 4.5 m (L x W)
  • Weight: 1.8 kg
  • Rope length: 150 cm
  • Indoor & Outdoor: Outdoor Use Only
  • With stainless steel fasteners
  • Wide application
  • Wind and water permeable
  • Assembly required: Yes
  • Delivery contains:
  • 1 x Sunshade Sail
  • 4 x 1.5 m PE rope
  • EAN: 8721364825246
  • SKU: 42032830
  • Brand: vidaXL
  • SKU: 42032830

 

EU responsible party

Haba Trading B.V. 

Mary Kingsleystraat 1 5928SK Venlo The Netherlands

Compliance-safety@vidaxl.com

Features

  • Brand
    VIDAXL
  • Colour
    White
  • Width
    300 cm
  • Warranty
    2 year(s)
  • Material
    HDPE
  • Pcs per pack
    1
  • Shape
    Rectangular
  • Length
    450 cm
  • Weight
    1.8 kg
  • UV resistant
    Yes
  • Wood color
    White
  • UV protection
    Yes
  • ManoMano Reference
    ME212865151
  • MMID
    875095487400
  • Product code
    8721364825246
  • EAN
    8721364825246

Customer reviews

Reviews summary
AI-generated content
  • Material Quality: The product feels solid and carefully made.
  • Ease of Installation: Assembly goes quickly and without hassle.
  • Wind Resistance: It stays firmly in place during strong gusts.
HHelene
Published on 12/06/2022, France

Light and resistant even by mistral. Nice shade. Only downside the dimensions: in reality is 1m80 by 4m30 and not 2m by 4m50 dimensions made at the ends but not in the center. Otherwise still good value for money.

IIsabelle
Published on 21/02/2022, France

very good product. As expected the shade is not total but sufficient even in the South, terrace facing South. Pretty, resistant, Finally a real square at an affordable price. Model chosen for a very windy region, and with an elastic

CCorbin
Published on 27/04/2022, France

I took the off-white canvas, because it feels "cooler" to me than getting under a dark canvas. Both the canvas and the seams seem solid, the installation is relatively easy, even in vanlife if you are a little ingenious. For that, you will need a vehicle roof, a few ropes, one or two carabiners and an essential accessory: two camping poles that you will find for 10€ at Decathlon.

IIsabelle
Published on 17/04/2023, France

Very good product, this is the 2nd one I order because it is very resistant and pretty. It allows the rain to pass through and provides a nice shade.

1 person found this helpful
NNOEL
Published on 30/06/2022, France

Corresponds to what I was looking for, and coincidentally it is the ideal size for me. It will be stretched vertically on a south-facing balcony facing the sea. Will only be implemented in July and August, but it seems that it will be perfectly adapted following trials.

MManoMano Customer
Published on 28/07/2022, France

Color corresponding to the description, easy to hang, pleasant shade but not obscuring.

Shade sail buying guide
Advice

Shade sail buying guide

Read our guide
You are here:
The DIY, home and garden specialist

The DIY, home and garden specialist

Reliable delivery

Reliable delivery

Flexible payment options

Flexible payment options

More than 7 million individual and professional customers

More than 7 million individual and professional customers